欧美日韩在线观看你懂的-日韩大奶骚妇被内射-最近免费中文字幕中文高清百度-嫩草影院久久国产精品-人人澡人人妻人人爽人人蜜桃-一本色道久久综合亚洲精品不卡-成年午夜av在线免费观看-日韩精品极品视频在线观看免费-青青草手机在线免费视频

Contact Us

Inflatable Air Blower cleaning process

Date: 2015-1-5   Click: 1664 Times

Finishing "Inflatable Air Blower" must pay attention to the fan power cord and clip the button, the line to be sorted out in advance, do not let the fan run when working on the line to produce a variety of contact, the power cord is in the initial position of the fan in general (both removed available).
Adjust the position of the radiator
The radiator tune in the right place, the place "Inflatable Air Blower" level to the processor port cover side, four point deduction buckle clasp around the column (beak antennae) in the bottom of the need to align with the motherboard. The radiator tune into the right position, the fan will be placed horizontally to cover the processor port side, the four point deduction buckle clasp around the column (beak antennae) in the bottom of the need to align with the motherboard. Motherboard Intel processor buckle hole distribution in the vicinity of the CPU socket, the user can easily observe the board found. Intel original radiator have to look at before installing rotary switch is fully restored in situ. "Inflatable Air Blower" As a result of the heat sink clip clip pressed four buckle design, so the best way is to install the clip "diagonal" push installation method. Order push uneven force likely to cause the fan, causing the other two buckle pressing difficulties.

Back to: Industry news

+86-0769-83660708

Home Product News Contact