九九热视频在线观看|日韩精品A∨片加勒比|性免费一区二区三区屯线|扒开小处30p|兽兽不雅视频|qovd电影|btse工厂

Contact Us

Blower Fan some failures Measures

Date: 2016-6-2   Click: 1991 Times

After "Blower Fan" started to slow expansion of production need to adjust the pressure according to the opening degree with diffuser "on" button and the "Close" key control to ensure the necessary air flow. Fan operation, the fan must be constantly monitored, pay attention to the fan current, temperature, oil pressure vacuum inlet of the sound, fan, temperature, vibration and so on. Time and make a record and, if abnormal, to promptly identify the reasons given to exclude and report production department, emergency stop can take action when necessary (use caution). Due to the production or maintenance, repair needs, stop the operation of a wind turbine. 1, to reduce the degree of opening of the diffuser to a minimum (minimum instruction diffuser green light). 2, with a finger touching the fan "Stop" button, the program began to shut down.

Back to: Industry news

+86-0769-83660708

Home Product News Contact